Separate material from assembly
A metal panel label does not establish the performance of the complete roof. Record deck, underlayment, coverings, gaps, edges and attachments.
Evidence boundary
Evaluate roof claims using current assembly listings, edge and opening details, adjacent materials and qualified review.
Decision file
A metal panel label does not establish the performance of the complete roof. Record deck, underlayment, coverings, gaps, edges and attachments.
Ask for the exact tested or listed assembly, product identifiers, limitations and installation conditions that match the proposal.
Document eaves, soffits, vents, ridges, walls, valleys and penetrations where gaps or debris can affect the assembly.
Record gutters, rooftop equipment, decks, fences, vegetation and stored materials as project context without promising risk reduction.
Ask how accessible roof, gutter and valley areas are inspected and maintained; do not use maintenance-free language.
Use current authority information and qualified review for actual performance and applicability. No page here certifies a fire class or outcome.
A metal panel description does not establish the fire classification of the complete roof. Record the deck, underlayment, insulation or cover board, fastening and tested configuration cited by the supplier, then compare that evidence with the actual proposed assembly.
Add eaves, ridges, valleys, vents, skylights, gutters and wall junctions to the evidence checklist, along with adjacent combustible materials and debris collection points. Route risk and code conclusions through current authoritative guidance and qualified project review.
Save the applicable code source, authority guidance, listing or evaluation document, manufacturer instructions and drawing revision with a checked date. If a product or layer changes, reopen the comparison rather than carrying forward the original assembly claim.
For every fire or wildfire-related statement, list the exact claim, current BC code or authority source, tested or assessed assembly identifier, product document, applicable limitations and proposed roof drawing. Compare all layers, attachment and edge conditions with the cited configuration; mark any mismatch unresolved. Include the checked date because listings and code editions change. Keep adjacent openings, debris zones and maintenance as separate project questions. This table supports review of evidence and must not turn a metal material label, isolated test or generic wildfire description into a certified classification or promised outcome.
Primary references
Links checked in the approved research packet on August 26, 2026. Applicability still depends on the property and proposed scope.