Draw the roof map
Number roof planes, valleys, walls, eaves, gutters, downspouts and penetrations so drawings, photos and proposals use the same references.
Critical-detail map
Create a roof-detail map for water concentration, drainage, penetrations, access and areas below possible snow movement.
Decision file
Number roof planes, valleys, walls, eaves, gutters, downspouts and penetrations so drawings, photos and proposals use the same references.
Record valleys, upper-to-lower discharges, wall intersections and drainage constraints without claiming a detail is adequate.
List current and planned vents, curbs, chimneys, skylights and equipment; require system-specific flashing details.
Identify entries, walkways, decks, parking, equipment and neighbouring areas that could be affected by water, ice or sliding snow.
Snow-retention need, layout, attachment and loads are design questions. Ask for the basis and coordinated details.
Compare safe access assumptions, debris zones, service routes and maintenance documentation.
Trace each roof plane to valleys, eaves, gutters, scuppers or lower roofs and mark where snowmelt or rain converges. Require proposal details for transitions and overflow-sensitive areas, including how temporary weather protection works while the existing roof is open.
Record entrances, sidewalks, decks, driveways, mechanical equipment and neighbour areas below sloped metal surfaces. Do not prescribe retention devices from a map; require qualified, system-compatible design evidence tied to loading, attachment and the actual roof geometry.
List vents, chimneys, skylights, curbs, antennas and planned solar supports by roof area. Ask for curb heights, flashing sequence, compatible materials, movement accommodation and responsible trade, then require photographs before closures conceal the work.
Number every valley, eave, gutter, wall, curb, penetration, lower-roof discharge and area below possible snow movement on the roof plan. For each, identify the accepted detail, responsible trade, temporary weather protection, required substrate evidence and photograph or inspection point. Connect proposed snow-management attachments to exact system data and qualified design. Record access for future clearing or inspection without directing unsafe roof work. The register should remain tied to the final roof geometry and should never be presented as a guarantee against leakage, ice, falling snow or extreme weather.